London View Management Framework
The London View Management Framework (LVMF) is a piece of Supplementary Planning Guidance (SPG) published by the Greater London Authority (GLA) in support of policies 7.11 and 7.12 of the Mayor of London’s ‘London Plan’. The London Plan is a spatial development strategy setting out an economic, environmental, transport and social framework for the development of London to 2031.
The London View Management Framework is intended to help preserve London's character and built heritage by setting out policy for managing the impact of developments on key panoramas, river prospects and townscape views. Guidance is targeted at boroughs, consultees and applicants for planning permission. It was published in March 2012 following a period of consultation.
Developments should seek to make a positive contribution to designated views, giving consideration to their impact on the foreground, middle ground and background of views.
The process of making a planning application for a development that might affect a designated view includes:
- Undertaking a scoping study in consultation with the local authority to assess whether the development impacts on designated views and agreeing assessment points from which that impact might be evaluated.
- Preparing a description of the view.
- Preparing a description of the impact on the view, including a description of the development, its location, setting, height, scale, design, external appearance and its relationship to important buildings and landmarks.
If an application does not conform with the principles and guidance set out in the LVMF, it should be refused.
The designated views are:
London panoramas:
- Alexandra Palace.
- Parliament Hill.
- Kenwood.
- Primrose Hill.
- Greenwich Park.
- Blackheath Point.
- The Mall to Buckingham Palace.
- Westminster Pier to St Paul’s Cathedral.
- King Henry VIII’s Mound, Richmond to St Paul’s Cathedral.
River prospects:
- Tower Bridge.
- London Bridge.
- Southwark Bridge.
- Millennium Bridge and Thames Side at Tate Modern.
- Blackfriars Bridge.
- Waterloo Bridge.
- The South Bank.
- Golden Jubilee/Hungerford Footbridges.
- Westminster Bridge.
- Lambeth Bridge.
- Victoria Embankment between Waterloo and Westminster Bridges.
- Jubilee Gardens and Thames Side in front of County Hall.
- Albert Embankment between Westminster and Lambeth Bridges
- Along Thames path near St Thomas’ Hospital
- Bridge over the Serpentine to Westminster.
- Island Gardens, Isle of Dogs to Royal Naval College.
- The Queen’s Walk to Tower of London.
- St James’s Park to Horse Guards Road.
- Parliament Square to Palace of Westminster.
In addition, The Secretary of State for Communities and Local Government has issued directions in relation to 13 Protected Vistas.
[edit] Related articles on Designing Buildings Wiki
- Accessible London.
- BREEAM Visual comfort View out.
- Central activities zone supplementary planning guidance.
- Design and access statement.
- GLA Housing Design SPG.
- Listed building.
- London plan.
- Opportunity Area Planning Framework (OAPF).
- Rights of way.
- Right to light.
- Right to a view.
- Strategic view.
- Supplementary planning guidance for London SPG.
- The London Plan.
- Value in the view: conserving historic urban views.
- View.
- Zone of theoretical visibility.
[edit] External references
- The Secretary of State for Communities and Local Government has issued directions in relation to 13 Protected Vistas.
- City of London Corporation, St Paul’s heights Limitations.
Featured articles and news
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.




















